Basic Info.
Model NO.
EB
Casting Form Usage Count
Permanent
Surface Treatment
Polishing
Surface Roughness
According to The Drawing
Coating
Syrup or pulp waste
Machining Tolerance
According to The Drawing
Standard
AISI
Certification
ISO 9001:2008
Hardness
>55HRC
Useage
Heat Treatment Furnace
Heat Resistance
High Temperature
Weight
Upon The Drawing
Model No.
Customized as The Drawing
Key Selling Points
High Satey Level
Transport Package
Plywood Case
Specification
100mm-1600mm
Trademark
EB
Origin
China
HS Code
8417909090
Production Capacity
500000kilograms/Year
Packaging & Delivery
Package Size
100.00cm * 100.00cm * 100.00cm
Package Gross Weight
30.000kg
Product Description
1.Introduction:
EB furnace rollers made from different materials,such as stainless steel,Ni-Cr Iron base heat-resistant steel,for heat
treatment furnaces with service temperature up to 1600ºC(2912°F).
EB's furnace rollers are made for different heat treatment processes for steel, aluminium,Zinc Alloy and other metallic
materials,which have been widely used in the following applications.
treatment furnaces with service temperature up to 1600ºC(2912°F).
EB's furnace rollers are made for different heat treatment processes for steel, aluminium,Zinc Alloy and other metallic
materials,which have been widely used in the following applications.
2.Inspection:
We have in-house facility for each inspection: Composition by Spectrometer; Size test,Mechanical test,NDT,UT,RT,PT,MT,ET.
3.Process:
Centrifugal casting for barrel/tube, forging for journal/shaft, static /investment or sand casting for cone/ trunions, welding
and machining and grinding
and machining and grinding
4.Chemical Composition:
Composition (%) | C | S | Si | Mn | P | Ni | Cr | Mo | Fe |
Ni-Cr Chill Roll | 3.34 | 0.04 | 0.66 | 0.7 | 0.39 | 1.26 | 2.05 | 0.36 | Bal. |
Composition (%) | C | Si | Mn | Cr | Ni | S | P |
1.4848 | 0.30~0.50 | 1.0~2.5 | ≤ 1.5 | 24.0~26.0 | 19.0~21.0 | ≤ 0.030 | ≤ 0.035 |
304 | ≤0.08 | ≤1.00 | ≤2.00 | 18.00-20.00 | 8.00-10.50 | ≤0.030 | ≤0.045 |
Q: Are you trading company or manufacturer ?
A: We are factory.
Q: How long is your delivery time?
A: Generally it is 5~10 days if the goods are in stock.Or it is 45 days if the goods are not in stock, it is according to quantity.
Q: What is your terms of payment ?
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 50% T/T in advance ,balance before shipment
irrevocable LC at sight.