Basic Info.
Product Description
Features:
1.Electrical control unit: adopt the European famous-brand processor control (PC) to monitor and control the whole line centrally and fully,
bring the easier operation and more stability. (option)
2. Slitting unit: adopt thenew-typeadjustable strucure, prolong the blade using time.
3. Integrated holding unit: renew the previous film take-off and holding structure, meet the higher line speed requirement.
4.Electric component unit: adopt world-famous brand product with international guarantee.
5. Apple to produce the PP, HDPE normal tape, fibrillated tape, folded tape and some other flat-type tape with various specifications.
Technical Parameters:
Item | UW-G100×33-800 | UW-G110×33-1100 | UW-G120×33-1300 | UW-G130×33-1500 |
Max.extrusion volume | 330kg/h | 400kg/h | 500kg/h | 600kg/h |
Screw Dia | Φ100mm | Φ110mm | Φ120mm | Φ130mm |
Ratio of L/D | 33:1 | 33:1 | 33:1 | 33:1 |
Rotate speed of screw | 20-120r/min | |||
Length of mold lip | 800mm | 1100mm | 1300mm | 1500mm |
Max.production speed | 450m/min | |||
Flat yarm fibre scope | 60-200tex | |||
Drwing of winde | 4-10 | |||
Winding number | 132Spindles | 180Spindles | 216Spindles | 252Spindles |
Machine Configuration:
Standard | Option |
Material loading | Hot air oven,length 6 m |
Auto vacuum material-feeding loader | |
Film take-off | Melt pump |
With multi drives and moisture absorption unit | |
Automatic filter | Static mixer |
Flat Die | Screw type loader/mixing unit Gravvimetric dosing/mixing unit |
Water quench tank | Flat tape fibrilator unit |
Slitting Unit | Flat tape fibrilator unit |
Integrated holding unit | Film thickness gauge and control system |
Edge trim recycle and reefed system | Industrial Process Computer/Eurpe |
Stretching section with 6 godets, incl.heating unit | Multi stretching and annealing section |
Vacuum tape extraction incl.collection box |
Product structure diagram:
Applications:
Company Information:
FAQ:
1. Are you trading company or manufacturer?
We are manufacturer, and also provide the business solution to all the friends.
2. What's payment terms you accept?
The buyer make the 30% deposite,the 70% balance will be paid by TT within 7 days before delivery or the buyer open 100% irrevocable L/C at sight as the appointed bank of the seller.
3. What's the delivery time?
The seller will arrange shipment within 90working days once confirm the order.
4. How to install and debug the machine after arrival?
We will provide instructions and installation videos. If the Buyer needs engineers to install in the local area, the buyer should pay USD150 per day for subsidy of engineers and afford the charge of daliy life(including the daliy meal ,traffic and hotel) in the locus of buyer and return tickets from China to User's factory.
5. Does it easy to operate and what can i do if it doesn't work?
First ,our machine is stable and easy to operate by one man ,what you do is just learn some basic thing. And we will sent you manual and video ,we suggest you to come to visit our factory to learn more thing by yourself , and if there is something goes wrong , you can call us ,video-chat ,email us . And we will give solutions within 36 hrs .Our engineer also can be distributed to overseas as you required.
6. How long is your machine's warranty period?
Seller warrants the products for 13 months from the B/L date.